2026-05-26 14:22
Mechanical
Rod Mill 2 - main motor bearing
4.7 hours
Wave-detected vibration spike at 38 Hz triggered alert; SAP PM01 1051RM-RM2-249 raised after 22 min runtime gap.
2026-05-19 06:48
Electrical
Rod Mill 1 - drive controller
2.1 hours
Drive trip cleared after firmware reset; no follow-up SAP order required.
2026-05-12 23:05
Mechanical
Rod Mill 3 - liner replacement
9.3 hours
Planned outage extended by 1.8 hours; SAP PM02 1051RM-RM3-310 attached to history record.
2026-05-03 11:12
Instrumentation
Rod Mill 4 - vibration channel 3
0.4 hours
Channel timeout; auto-recovered on next collector heartbeat.
Sample shape from the past 30 days. Live binding via data-api="downtime-events-grid" on the maintenance history API.